Sector
Agricultural
End-use
Process Loads
Project Number
ET13SCE7020
Conduct field evaluation of the performance of a novel approach to cooling dairy cows by installing hydronic heat exchanger panels beneath the manure free stall beds. The project will measure energy consumption of the new system relative to the baseline high-speed low-volume fans and feed lane...
Sector
Commercial
End-use
Process Loads
Project Number
ET13SCE1190
Field evaluation of vacuum sealing/packaging machines of 3 sites for use in supermarkets. Rather than leaving the heating element on continuously, the new unit activates the heating element used to seal packages only when the machine is in use. Same technology as was tesed in...
Sector
Industrial
End-use
Process Loads
Project Number
ET13SCE1140
No-loss drains expel condensate from compressed air systems, with no associated loss of compressed air. They typically are installed at the compressor, air dryer, filter, storage tank, or at any low point in the piping where moisture might collect. No-loss drains open a valve only when signaled by...
Sector
Commercial
End-use
HVAC
Project Number
ET13SCE1040
The purpose of this project is to field-assess a Roof Top Units (RTU) retrofit technology that combines evaporative pre-cooling of AC unit condenser air with sensible pre-cooling of outside air. Assessment will study installation and operation issues, water consumption, peak kW reduction and kWh...
Sector
Commercial
End-use
HVAC
Project Number
ET13SCE1070
Retrofit to existing RTU that steps supply fan speed in response to calls for cooling or heating. Technology controls outside air in response to occupancy sensors and CO2 monitors. The purpose of this project is to review the effectiveness of the above...
Sector
Residential
End-use
Whole Building
Project Number
ET10SCE2010
The purpose of this project is to demonstrate zero-net-energy (ZNE) or near ZNE by retrofitting several homes by applying energy efficiency measures, demand response enabling technologies, and renewable generation source. This is a field demonstration project consisting of simulation, identifying...
Sector
Commercial
End-use
HVAC
Project Number
ET13SCE1130
Evaporatively cools incoming condenser air of air-cooled HVAC equipment. The purpose of this project is to test the feasibility of installing a technology on existing rooftop AC units that lowers the incoming condenser air temperature. The technology uses water evaporation to accomplish this air...
Sector
Commercial
End-use
Whole Building
Project Number
ET11SCE1262
This project will assess phase change materials (PCMs) in single-wide mobile homes. The test will consist of three test homes: a control (no PCM), PCM in walls, and PCM in the ceiling. Results will inform energy performance potential of...
Sector
Commercial
End-use
Process Loads
Project Number
ET12SCE5010
Cook and Hold ovens are commercial kitchen equipment used to cook food product at low temperatures, followed by a holding period at a specified temperature. Currently, no ASTM standard test procedure exists for cook and hold ovens. A standard has been drafted but needs to be vetted in a laboratory...
Sector
Commercial
End-use
Lighting
Project Number
ET14SCE1080
This project is to assess the performance of a LED and photo luminescent hybrid exit sign that uses a 0.5W LED to power a Photoluminescent sign face. The project will evaluate power usage to calculate potential savings as compared to standard LED exit...