Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR19.07
The aim of this sub-project is to collect data on electricity consumed by equipment in newly-constructed homes that are either required by health and safety codes or are considered necessary to make the house attractive to buyers. This aspect of residential energy use has not been studied but...
Sector
Commercial
End-use
Process Loads
Project Number
ET19SCE1110
Emerging technology evaluation of refrigerated display case shelf edge guiding vanes. This technology is applicable to all users of open medium temperature refrigerated display cases. Sectors include supermarkets, and convenience stores. Any cold merchandising that utilize an open display case...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR19.03
This project’s goals are to test optimization of connected thermostats and other loads via voice commands based on TOU rate peak times and customer preferences. Voice interactions related to energy (usage, estimated bills, best times to use appliances, etc.) will undergo evaluation to determine...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
ET20SCE1050
The aim of this sub-project is to collect data on electricity consumed by equipment in newly-constructed homes that are either required by health and safety codes or are considered necessary to make the house attractive to buyers. This aspect of residential energy use has not been studied but...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR19.02
"Battery energy storage systems work by capturing electricity produced by both renewable and nonrenewable resources and storing it for discharge when required. The solution allows users to come off the grid and switch to stored electricity, at a time most beneficial, giving greater flexibility and...
Sector
Industrial
End-use
Process Loads
Project Number
ET21SCE0008
Perform measurement and verification of NanO2 aeration technology to reduce wastewater treatment plant blower load while eliminating sewer system odor and...
Sector
Commercial
End-use
Process Loads
Project Number
ET21SCE0003
Evaluation of solar thermal system integrated with campus central plant hot water loop. Target temperature for the supplemental solar thermal array is 160'F and will eliminate most of the existing heat provided by the boilers and the central plant.
CSUDH is part of the CEOP pilot to minimize GHG...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR18.05
Retail Automated Transactive Energy Systems (BESS & PV)...
Sector
Other
End-use
Whole Building
Project Number
DR18.06
Willowbrook Low-Income Multi-Family DER: Energy Storage with PV...
Sector
Commercial
End-use
Whole Building
Project Number
ET20SCE7060
Work with campus engineering personnel to collect pertinent energy, temperature and fluid flow data for analysis. Identify all data sets and points that can effect Plant and Building efficiency and continued performance. Then determine the most appropriate BAS platform to pull all of the data...