Sector
Commercial, Public
End-use
Process
Project Number
ET16PGE1941
The objective of this study is to determine energy and cost savings as a result of replacing conventional broilers with best-in-class broilers. The project will characterize the technological improvements that contribute to energy reductions in broilers across the market; monitor energy...
Sector
Residential
End-use
HVAC
Project Number
DR13.06
This sub-project will evaluate the demand response capability of residential variable capacity heat pump (VCHP) systems. These are "traditional American-style" high static ducked systems. Testing will focus on one to two systems from three to five manufacturers. Lab testing and field testing will...
Sector
Commercial
End-use
Plug Loads and Appliances
Project Number
DR12.20
This project seeks to advance and support participation in the Permanent Load Shift (PLS) Program. Using the latest, advanced building energy simulation engine, a pre-feasibility tool will be created. In this tool, thermal energy storage (TES) models will be defined for chilled water systems, ice...
Sector
Commercial
End-use
HVAC
Project Number
DR12.19
This project will leverage the efforts from ET13SCE7060 (Analysis of Next-Generation Home/Building Energy Management Systems) to conduct laboratory and field evaluations of currently available home/building area network systems. This activity will assess the systems’ effectiveness in implementing...
Sector
Commercial
End-use
Process Loads
Project Number
DR15.13
This project would leverage stationary batteries (existing and new installations) and communication infrastructure for testing DR opportunities at commercial and industrial customer...
Sector
Commercial
End-use
Process Loads
Project Number
ET14SCE7010
This project will provide technical support in the development of a standard test method to rate the performance and energy consumption of commercial rethermalizer ovens. Testing support will encompass sensitivity testing for different food products and cooking procedures based on stakeholder...
Sector
Commercial
End-use
Process Loads
Project Number
ET13SCE7240
The purpose of this laboratory evaluation is to understand where improvements to the ASTM standard can be made. A few commercially available preparation tables will be tested per the standard so the TTC team can see it in action and collect baseline data. After this, the tests will be performed...
Sector
Residential
End-use
HVAC
Project Number
ET13SCE7150
This project will leverage the efforts from ET13SCE7060 (Analysis of Next-Generation Home/Building Energy Management Systems) to conduct laboratory and field evaluations of currently available home/building area network systems. This activity will assess the systems’ effectiveness in implementing...
Sector
Commercial
End-use
Process Loads
Project Number
ET13SCE1210
Rethermalization ovens or “Retherms” are heated cabinets used to reheat previously prepared, stored and chilled food product to serving temperature all while retaining the food product’s color, flavor, texture and nutrients. Retherms are popular among schools, hospitals, prisons, and other...
Sector
Commercial
End-use
HVAC
Project Number
ET15SCE1220
The goal of this project is to determine and validate energy savings for a typical retrofit for two delta T valves in an HVAC chiller system. Delta T is the difference between the water supply and return temperature across a cooling coil. When downstream cooling coils have a low delta T, it can...