Sector
Commercial
End-use
Lighting
Project Number
PGE 0819
Project SummaryThis report summarizes the installation and assessment of an integrated "task ambient" lighting system combined with a reduction of ambient overhead lighting and increase in task lighting, at a multi-story commercial office building in Northern California. Relying primarily on field...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0817
This report summarizes the installation and assessment of advanced skylight systems at a retail hardware store in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as well as customer satisfaction surveys and economic payback...
Sector
Commercial, Industrial
End-use
Lighting
Project Number
PGE 0814
Project SummaryThis report summarizes the installation and assessment of advanced lighting control systems at the administrative offices of an engineering consulting firm in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements,...
Sector
Commercial, Industrial
End-use
Lighting
Project Number
PGE 0813
Project Summary This report summarizes the installation and assessment of advanced lighting control systems at the administrative offices of a large beverage processing plant in Northern California. Relying primarily on field testing, the project team conducted photometric and power...
Sector
Commercial, Public
End-use
Lighting
Project Number
PGE 0806
Project SummaryThis report summarizes the installation and assessment of advanced lighting control systems at the administrative offices of a water district location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as...
Sector
Commercial, Public, Industrial
End-use
Other
Project Number
PGE 0826
Project Summary This report summarizes the functional performance and demand response (DR) potential of three advanced lighting control technologies that were assessed in office environments in Northern California. The technologies assessed included the Adura LightPoint System,...
Sector
Other
End-use
HVAC
Project Number
PGE 0812
Project SummaryA significant portion of the energy in data centers is currently dedicated to provide cooling for the server equipment. Data centers must provide continuous air conditioning to address high internal heat loads (heat release from computer servers) and maintain indoor temperatures...
Sector
Industrial
End-use
Process
Project Number
PGE 0810
Solar-powered circulator technology is an emerging technology that uses solar-powered equipment to drive a radial flow process that provides laminar circulation in water and wastewater systems such as water tanks and reservoirs, wastewater ponds and lagoons In addition, it can be used to improve...
Sector
Commercial
End-use
Other
Project Number
PGE 0802
Project SummaryThis report describes the results of an assessment of the energy impacts resulting from use of ozone in an on-premise hotel laundry facility. The value of the natural gas saved due to the replacement of hot water with cold was the leading component of total savings. The value...
Sector
Commercial, Public
End-use
Other
Project Number
PGE 0803
The purpose of this study was to identify strategies for increasing the market penetration of energy efficiency in the large office building markets. This report describes market trends and building owner values with respect to energy efficiency and makes programmatic recommendations for products...