Sector
End-use
Other, Whole Building
Project Number
DRET14PGE1003
2014 - 2015
PG&E
PDF Available
COMPLETE
The main purpose of this study is to analyze and identify existing end-use loads that are sizeable enough and flexible enough to help address operational and planning needs and to determine if these loads can be managed through existing programs or, if not, through modified and new...