Sector
Commercial
End-use
Process Loads
Project Number
DR13.07
This sub-project will explore and document advances in product development for advanced refrigerants in refrigeration systems with the goal of identifying products for laboratory evaluation and field deployment. Advanced product development engineering, primarily built on the foundations of...
Sector
Commercial
End-use
Process Loads
Project Number
ET13SCE1171
Field evaluation of 5 hotel/motel sites retrofitting existing commercial pool pump with variable speed controls. This effort will be used in conjunction with the market characterization in phase 1 to develop a work paper to deem this measure. The measure is currently offered in programs as a custom...
Sector
Commercial
End-use
Process Loads
Project Number
ET14SCE7110
Feasibility phase for a demonstration project with the objective is to link building energy retrofits with electric transportation system linking buildings to public transportation. To scale adoption of key technologies including energy efficiency, energy storage, distributed generation, charging...
Sector
Commercial
End-use
Lighting
Project Number
ET14SCE1080
This project is to assess the performance of a LED and photo luminescent hybrid exit sign that uses a 0.5W LED to power a Photoluminescent sign face. The project will evaluate power usage to calculate potential savings as compared to standard LED exit...
Sector
Commercial
End-use
Lighting
Project Number
ET14SCE1020
To conduct a laboratory test in order to determine the potential energy savings of occupancy counting switch in lieu of conventional devices such as timer switch, or Pyroelectric InfraRed (PIR) and ultrasonic type occupancy sensors. The conventional technology uses occupancy sensors with switching...
Sector
Commercial
End-use
Whole Building
Project Number
ET14SDG1101
Ongoing commissioning (OCx) is an innovative approach to managing buildings – it provides continuous improvement in the operation of building systems. OCx is a multi-step implementation process, followed by a step-by-step continuous improvement cycle. Implementing this process within...
Sector
Residential
End-use
Whole Building
Project Number
ET14PGE8916
Under the auspices of PG&E’s Zero Net Energy (ZNE) Production Builder Demonstration, De Young Properties built a 2,019 square foot ZNE home in Clovis, CA. This report describes the results from monitoring the occupied home for a full year.The ZNE definition used for the design was based...
Sector
Commercial
End-use
Lighting
Project Number
ET14SCE1140
This project will evaluate dedicated LED track lighting systems, which do not allow for conversion to other source types. Additionally, the use of LED screw-base lamps for use with traditional track lighting, current limiting devices and phase-cut dimming controls will be evaluated at both line and...
Sector
Residential
End-use
HVAC, Water Heating/DHW/HPWH, Whole Building, Other
Project Number
ET14PGE8912
Under the auspices of PG&E’s Zero Net Energy (ZNE) Production Builder Demonstration, Meritage Homes built a 2,047 square foot ZNE home in Hayward, CA. This report describes the results from monitoring the occupied home for a full year.Actual site energy use was compared to two models: one...
Sector
Residential
End-use
HVAC, Water Heating/DHW/HPWH, Whole Building, Other
Project Number
ET14PGE8913
Under the auspices of PG&E’s Zero Net Energy (ZNE) Production Builder Demonstration, PulteGroup built a 2,359 square foot ZNE home in Brentwood, CA with a semi-conditioned attic and an air source heat pump. This report describes the results from monitoring the occupied home for a full...