Skip to main content
Project Info COMPLETE Project Title

ZigBee-based DR Residential Pool Pumps

Project Number DR12.51 Organization SCE End-use Process Loads Sector Residential Project Year(s) 2012 - 2013
Description
The purpose of this project is to perform laboratory and field tests of commercially available pool pumps and pool pump controllers designed to enable curtailment of pool pump loads in response to DR event (curtailment) or pricing signals. This work is a follow-up to prior studies that estimated the potential for residential pool pumps to act as a DR resource. This project will include field trials of a pool pump with integrated DR capabilities to assess functionality, as well as retrofit solutions that would add DR capabilities to existing pool pumps.
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.