Skip to main content
Sector Residential
End-use Other
Project Number DR10SCE1603
2010 - 2012
SCE
PDF Available
COMPLETE
The objectives of the testing were to quantify the DR potential for dishwasher A and characterize its response to DR signals under varying operational scenarios. The project included two types of tests: - Acquire the power profile data of dishwasher A under various operational settings - Quantify...
Sector Industrial
End-use Process Loads
Project Number ET12SCE1030
2012 - 2012
SCE
PDF Available
COMPLETE
DC sanders are designed to replace traditional sanders that run on compressed air systems that are inefficient and waste energy. This technology is designed to improve reliability and energy efficiency across this application in commercial and industrial...
Sector Commercial
End-use Whole Building
Project Number ET11PGE4221
2011 - 2012
PG&E
PDF Available
COMPLETE
The goal of this study was a quantitative analysis researching the known penetration of energy management systems (EMS) for existing commercial buildings in PG&E territory and a snapshot of the Energy Management and Information Systems (EMIS) technologies currently available. HMG used the...
Sector Commercial
End-use Other
Project Number DR10SCE0501
2010 - 2012
SCE
PDF Available
COMPLETE
The purpose of this study was to conduct field measurements to evaluate the Demand Response (DR) capabilities of Programmable Communicating Thermostats (PCTs) leveraging Open Automated Demand Response (OpenADR). This evaluation specifically relates to packaged rooftop Heating Ventilation and Air...
Sector Commercial, Residential
End-use Whole Building
Project Number ET12PGE1201
2012 - 2012
PG&E
PDF Available
COMPLETE
Pacific Gas and Electric Company (PG&E) contracted with the Heschong Mahone Group (HMG) to provide an evaluation of selected benchmarking software tools that could integrate with existing California regulations and utility programs and support goals identified in the California Long Term Energy...
Sector Commercial
End-use Whole Building
Project Number ET12PGE1311
2012 - 2012
PG&E
PDF Available
COMPLETE
The energy tracking function of energy management and information system  (EMIS) software has the potential benefit of assessing technologies, such as building controls and the functionality of the EMIS software technology themselves (i.e. customer engagement), that produce operational and...
Sector Commercial
End-use Lighting
Project Number ET12PGE3351
2012 - 2012
PG&E
PDF Available
COMPLETE
The project evaluated the performance of the 15W Amerlux Hornet LED fixture as a potential replacement for a variety of low voltage halogen MR16 track lighting applications in a Northern California Safeway grocery store. Given their small form factor and design, which enables them to provide a...
Sector Commercial
End-use Whole Building, Lighting
Project Number ET11PGE1041
2011 - 2012
PG&E
PDF Available
COMPLETE
This report is of the first phase of a technical analysis that evaluates the savings potential and market viability of ‘advanced window film’ products that may offer improved characteristics relative to traditional tinted films. The advanced window films, defined for this project as ‘spectrally...
Sector Commercial
End-use Lighting
Project Number ET11PGE5202
2011 - 2012
PG&E
PDF Available
COMPLETE
The goal of this project is to establish a laboratory testing program to verify or refute light emitting diode (LED) manufacturer’s product claims regarding life, lumen and color maintenance of directional LED replacement lamps for use in the retail market. Test results will be provided to the...
Sector Commercial
End-use HVAC
Project Number ET11PGE5272
2012 - 2012
PG&E
PDF Available
COMPLETE
This is the final report for 2012 phase (Phase II) of the boiler research performed at PG&E’s Applied Technology Services (ATS) in support of ASHRAE Standard 155P. Standard 155P, “Method of Testing for Rating Commercial Space Heating Boiler Systems”, has been under development by ASHRAE for...
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.