Sector
Commercial
End-use
Whole Building
Project Number
DR19.09
Create a specification for a standardized building-level VEN (VENB) and output application interface, which will eliminate the burden of ADR connectivity from the individual end-use loads. Loads need only connect to the VENB via its defined communication interface and then receive a standardized...
Sector
Commercial
End-use
Process Loads
Project Number
DR17.05
This technology provides permanent load shifting (PLS) for commercial refrigeration systems, similar to the HVAC thermal energy storage systems that are used for PLS at many facilities with central plants. kW Engineering will provide measurement and verification services at one Stater Brothers...
Sector
Residential
End-use
Water Heating/DHW/HPWH
Project Number
DR20.01
Codes and Standards will work with ENERGY STAR on two aspects: 1) update the test methods for “connected water heaters” and ENERGY STAR...
Sector
Commercial
End-use
HVAC
Project Number
DR20.02
Demand management and flexibility test of a commercial building with implemented EE and DR...
Sector
Commercial
End-use
Process Loads
Project Number
DR19.04
This project will help determine the effectiveness of Phase Change Materials (PCMs) in cold storage applications at Low Temperature -10 - 0 F (-23 - 18 C). Controls will also be implemented into the study to determine how compatible it is with PCMs. A total of 4 tests will be done on warehouses to...
Sector
Other
End-use
Plug Loads and Appliances
Project Number
DR17.01
OpenADR Test Lab Development - SCE Technology Test Center...
Sector
Industrial
End-use
Process Loads
Project Number
ET19SCE1090
Perform measurement and verification of NanO2 aeration technology to reduce wastewater treatment plant blower load while eliminating sewer system odor and...
Sector
Commercial
End-use
Process Loads
Project Number
ET19SCE1150
Tasks 1. Survey of Craft Brewing Industry Identify common brewery configurations, typical equipment needs, process and operational characteristics through internet research, phone interviews, and site visits with end-users to characterize the energy and water intensity of the craft brewing...
Sector
Commercial
End-use
Whole Building
Project Number
ET16SCE1110
Predictive Energy Optimization acts as an automated supervisory control system for HVAC systems in commercial buildings, designed to reduce energy consumption, operating costs and CO2 emissions. It connects to most existing building management and control systems (BMCS) using industry standard...
Sector
Commercial
End-use
HVAC
Project Number
ET17SCE1070
Project involves lab assessment of HVAC device on 5-ton RTU heat pump currently installed in TTC laboratories. The device varies the speed of the compressor as needed. Assessment will involve AHRI-style tests. All testing will be in cooling...