Project Info
COMPLETE
Project Title
DR-Ready LED Lighting Systems with Advanced Controls in Fast Food Restaurants
Project Number DR12SCE06 Organization SCE End-use Lighting Sector Commercial Project Year(s) 2012 - 2012Description
This study conducted field measurements to evaluate the Demand Response (DR) capabilities of four different advanced lighting controls systems (ALCS). This evaluation specifically relates to Light Emitting Diode (LED) interior lighting in fast food restaurants. The main objectives of the project were to:
- Determine whether the ALCS can be scheduled for reliable control of lighting loads as part of Manual DR test events
- Determine whether the ALCS can be scheduled for reliable control of lighting loads as part of an Automated Demand Response
(AutoDR) test events
Project Report Document
Loading PDF Preview...