Skip to main content
Project Info ACTIVE Project Title

CSUDH Solar Thermal Integrated Supplemental Process Heat Evaluation

Project Number ET21SCE0003 Organization SCE End-use Process Loads Sector Commercial Project Year(s) 2021 - 2022
Description
Evaluation of solar thermal system integrated with campus central plant hot water loop.  Target temperature for the supplemental solar thermal array is 160'F and will eliminate most of the existing heat provided by the boilers and the central plant. CSUDH is part of the CEOP pilot to minimize GHG emissions, including improving overall energy efficiency for the campus. Analysis will be performed for the economic and efficiency opportunities in an efficient system comprised of heat pumps and solar thermal to entirely replace the existing high efficiency gas boilers.
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.