Skip to main content
Project Info COMPLETE Project Title

Advanced Lighting Control System in an Office Building

Project Number ET12PGE1031 Organization PG&E End-use Lighting Sector Commercial Project Year(s) 2012 - 2013
Description
The project evaluated wireless lighting controls technology at the Contra Costa County Office of Education building. The project area consisted of two private offices, two open offices, and a non-daylight area. The general lighting for the area is provided primarily by 2' x 4' linear fluorescent fixtures recessed into a grid T-bar ceiling. The existing lighting was retrofitted with new electronic dimming ballasts and wireless controls. The project measured the electrical and lighting characteristics for the base case and for the case of each control strategy, including measured aggregate load measurement, work area load measurement, and work area lighting measurement.
Project Report Document
Loading PDF Preview...
Industry
I have read and accept the Privacy Policy and Terms of Use
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.